Analisis Kerja Rele Overall Differential pada Generator Unit I PLTA Ketenger PT Indonesia Power UBP Mrica

Hari Prasetijo(1*), Firman Arif Romadhona(2)

(1) Prodi Teknik Elektro Universitas Jenderal Soedirman
(2) Prodi Teknik Elektro Universitas Jenderal Soedirman
(*) Corresponding Author

Abstract

Plant has two important equipment that are the generator and transformer. Therefore, it should be protected well by the overall differential relay. This relay must be reliable from the disturbances that might arise. In this study a simulation was conducted to obtain and test the overall differential relay setting at generator unit 1 PLTA Ketenger. Modelling was done with MATLAB Simulink 7.0.1 to check the overall differential relay protection system from potentialproblems. The model was given several disturbances, namely 1) short circuit fault in the security area, 2) short circuit fault outside the security area, and 3) lightning disturbances when damaged arrester. From the simulation results, the overall differential relay operating current is 1.73 A (primary side) and 1.64 A (secondary side). The results show that the overall differential relay provides a good response, except in the lightning fault with a current above 9x109 A (going the mismatch). For handlingthis problem another arrester should be added.

Keywords

rele overall differential, unjuk kerja, seting rele,simulink

Full Text:

PDF

Refbacks

  • There are currently no refbacks.